-
Notifications
You must be signed in to change notification settings - Fork 16
Pull requests: openshift/dpu-operator
Author
Label
Projects
Milestones
Reviews
Assignee
Sort
Pull requests list
OCPBUGS-45375: Updating dpu-operator-container image to be consistent with ART for 4.19
backport-risk-assessed
Indicates a PR to a release branch has been evaluated and considered safe to accept.
bugzilla/valid-bug
Indicates that a referenced Bugzilla bug is valid for the branch this PR is targeting.
cherry-pick-approved
Indicates a cherry-pick PR into a release branch has been approved by the release branch manager.
jira/valid-bug
Indicates that a referenced Jira bug is valid for the branch this PR is targeting.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
#220
opened Dec 3, 2024 by
openshift-bot
Loading…
Get closer to green ci
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
#218
opened Nov 29, 2024 by
bn222
Loading…
Enhance Cluster Environment Detection for OSTree-Based and Classic RHEL Systems
ok-to-test
Indicates a non-member PR verified by an org member that is safe to test.
#215
opened Nov 21, 2024 by
SamD2021
Loading…
Introduce afero in allocator
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
#214
opened Nov 21, 2024 by
bn222
Loading…
[th/validating-webhook] add validating admission webhook to check DpuOperatorConfig
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
needs-ok-to-test
Indicates a PR that requires an org member to verify it is safe to test.
#213
opened Nov 18, 2024 by
thom311
Loading…
WIP: Add intel vsp
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
#210
opened Nov 16, 2024 by
bn222
Loading…
Add test against cda cluster to validate sfc behavior
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
lgtm
Indicates that a PR is ready to be merged.
#201
opened Oct 31, 2024 by
bn222
Loading…
Add Host Network Attachment Definition
needs-ok-to-test
Indicates a PR that requires an org member to verify it is safe to test.
#192
opened Oct 21, 2024 by
SamD2021
Loading…
Add sriov dp admission controller to dpu operator
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
needs-rebase
Indicates a PR cannot be merged because it has merge conflicts with HEAD.
ProTip!
What’s not been updated in a month: updated:<2024-11-03.