Skip to content

revise: multiple revisions to the prototype #26

revise: multiple revisions to the prototype

revise: multiple revisions to the prototype #26

Triggered via push September 27, 2024 16:40
Status Failure
Total duration 1m 21s
Artifacts

CI.yml

on: push
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

9 errors
lint
Process completed with exit code 101.
test (macos-latest)
Process completed with exit code 101.
msrv
Process completed with exit code 1.
test (windows-latest)
The job was canceled because "macos-latest" failed.
test (windows-latest)
The operation was canceled.
test-examples
Process completed with exit code 101.
test (ubuntu-latest)
The job was canceled because "macos-latest" failed.
test (ubuntu-latest)
The operation was canceled.
docs
Process completed with exit code 101.