Skip to content

December 2020 Morning Status Meetings

sblondel edited this page Dec 18, 2020 · 11 revisions

This page contains a brief summary of the status of the Xolotl development team each morning during the month of December 2020.

20201201

Sophie - Continuing to clean the visu and building the NE coupling code with gperftools.

20201202

Sophie - Continuing to clean the plsm-network branch and running geometric gradation grid simulations.

20201204

Sophie - Continuing to clean the plsm-network branch (network) and looking at MMS.

20201207

Sophie - Running heat and He simulation with various grids to look at the maximum time-step allowed.

20201208

Sophie - Continuing the heat simulations and writing a script to get the largest dt.

20201209

Sophie - Continuing to work on the issue on sawtooth with gperftools. Adding geometric gradation grid option.

20201211

Sophie - Working on the Soret effect.

20201214

Sophie - Continuing on the Soret effect and geometric gradation grid.

20201215

Sophie - Working on WEST heat equation with different BC, continuing on the Soret effect.

20201216

Sophie - Continuing on the Soret effect and crater bursting.

20201218

Sophie - Checking the modified TM in plsm branch with HeDTV grouping, planning for geometric grid simulations.

Clone this wiki locally