This page contains a brief summary of the status of the Xolotl development team each morning during the month of July 2019.
Sophie - Analyzing the coupled simulation results and migrating to the ACF.
Sophie - Working on why there is a divergence issue in the coupled code. Testing Cori and the ACF. Working on the ITER stuck simulations.
Sophie - Passing the volume fraction to MOOSE. Working on the ITER stuck simulations.
Sophie - Working on the ITER stuck simulations. Starting the SciDAC poster.
Sophie - Analyzing the scaling of Xolotl NE in 2D. Continuing on the SciDAC poster.
Sophie - Working on the ITER stuck simulations, profiling the coupled code in Valgrind to find uninitialized variables.
Sophie - Working on the PI SciDAC poster.
Sophie - Finishing the SciDAC poster. Implementing to skip the pre-loop for modified TM when not needed.
Sophie - Implementing Shashi's method of limiting small numbers in the solver. Checking the pre-implanted ITER runs.
Sophie - Testing the heat equation with different grids. Working on visualization data in 1D.
Sophie - Working on the stuck ITER cases. Continuing to test the heat equation with different grids.
Sophie - Gathering the differences between SPICES and Xolotl for 800H case. Trying to reproduce old modified trap mutation results.
Sophie - Merging the 800H branch improvement on the NE network back to the trunk. Continuing to work on reproducing old modified trap mutation results.
Sophie - Recompiling on Cori. Continuing to work on reproducing old modified trap mutation results.
Sophie - Working on the SPICES Xolotl comparison and testing a shutdown cycle on the NE fuel.