November 2018 Morning Status Meetings

sblondel edited this page Nov 30, 2018 · 12 revisions

This page contains a brief summary of the status of the Xolotl development team each morning during the month of November 2018.

20181102

Sophie - Working on the APS-DPP presentation, and implementing reset() methods for the monitors for coupling with MOOSE.

20181105

Sophie - Working on the APS-DPP presentation, and looking at why the MOOSE coupling only works on 1 MPI process.

20181113

Sophie - Restarting the pre-implanted simulation for ITER. Preparing the 800H branch for Chris's conditions in 0D. Testing MOOSE coupling in parallel.

20181114

Sophie - Continuing to work on the 800H branch for Chris's conditions in 0D. Starting to develop a script to easily transfer data from He simulations to HeDT.

20181116

Sophie - Continuing to work on the 800H branch for Chris's conditions in 0D. Restarting pre-implanted simulation with different H radius.

20181119

Sophie - Fixing the grouping with moments in the 800H branch. Looking at why some ITER simulations get stuck.

20181120

Sophie - Implementing a more accurate diffusion and advection with varying temperature.

20181121

Sophie - Testing a more accurate diffusion and advection implementation with varying temperature. Continuing to try to understand why some ITER simulations get stuck.

20181126

Sophie - Continuing to test a more accurate diffusion and advection implementation with varying temperature. Looking at grouping with moments for HeV.

20181127

Sophie - Implementing the more accurate diffusion with varying temperature in 2D/3D. Looking at grouping with moments for HeV.

20181128

Sophie - Fixing the grouping with moments for HeDT. Continuing to check why some ITER runs get stuck.

20181130

Sophie - Continuing to test ways to get larger time steps in ITER simulations. Running simulations with KMC radius.