20200203

Sophie - Continuing to try to run the NE coupled code with gperftools. Investigating the dynamic surface data.

20200204

Sophie - Profiling NE coupled code with gperftools and compiling MOOSE with it on Falcon. Working on network factory for plsm.

20200205

Sophie - Working on the network factory for plsm and on saving bursting data in HDF5.

20200210

Sophie - Comparing data from the dynamic grid branch. Working on diffusion and advection in the plsm branch.

20200211

Sophie - Working on the erosion with the dynamic grid branch and on diffusion and advection in the plsm branch.

20200212

Sophie - Fixing the tests in plsm branch. Looking at the boundary conditions for NE coupling.

20200214

Sophie - Updating the modified reactions with plsm network.

20200220

Sophie - Testing the modified reactions in 0D in the plsm branch and updating the tests. Gathering data on the dynamic surface.

20200221

Sophie - Continuing to test the modified reactions in 0D in the plsm branch.

20200224

Sophie - Continuing to test the modified reactions in 0D in the plsm branch and cleaning up the tests.

20200225

Sophie - Continuing to test the modified reactions in 0D in the plsm branch.

20200226

Sophie - Starting on the experimental network in 1D.

20200228

Sophie - Continuing to work on the experimental network in 1D. Looking at using less memory in the pulsed cases.