ItEr75S24ResourcesTests

Jeroen Baten edited this page Mar 9, 2018 · 1 revision

TWiki> LibrePlan Web>ItEr75S24ResourcesTests (03 Jan 2012, JavierMoran)EditAttach

Story summary Tests in module resources
Iteration ItEr75week25To52
FEA ItEr75S24ResourcesTests
Story Lead  
Next Story  
Passed acceptance test No

Acceptance Criteria

Additional Specification Comments

Implementation Notes

Tests for Workers;

  • 1 - Create a new Worker
  • 2 - Create a Worker with duplicate type (it should be a failure)
  • 3 - Create a Worker with empty type (it should be a failure)
  • 4 - Create a Worker with duplicate name (it should be a failure)
  • 5 - Edit a Worker
  • 6 - Check other tabs
    • 6.1 - Check assigned criteria tab
      • 6.1.1 - Create a criterion
      • 6.1.2 - Assign this criterion to the worker
      • 6.1.3 - Try to delete the criterion
    • 6.2 - Check assigned calendar tab
      • 6.2.1 - Create a calendar
      • 6.2.2 - Assign this calendar to the worker
      • 6.2.3 - Try to delete the calendar
    • 6.3 - Check assigned cost category tab
      • 6.3.1 - Create a work hour
      • 6.3.2 - Create a cost category
      • 6.3.3 - Assign this cost category to the worker
      • 6.3.4 - Try to delete the cost category
  • 7 - Try create a Worker without Code
    • 7.1 - Change configuration
    • 7.2 - create a Worker without Code (it should be a failure)
  • 8 - Assign the Worker in a project
    • 8.1 - Create a project
    • 8.2 - Create a task
    • 8.3 - Assign the Worker in limiting resource form
    • 8.4 - Try to delete the assigned Worker
    • 8.5 - Delete the Project
  • 9 - Delete Worker
  • 10 - Delete all required elements

Tests for Machines:

  • 1 - Create a new Machine
  • 2 - Create a Machine with empty name (it should be a failure)
  • 3 - Edit a Machine
  • 4 - Assign a criteria to a machine
    • 5.1 - Create a criteria
    • 5.2 - Edit Assigned criteria tab
    • 5.3 - Try to delete a assigned criteria
  • 5 - Assign a calendar
    • 5.1 - Create a calendar
    • 5.2 - Edit Calendar tab
    • 5.3 - Try to delete a assigned calendar
  • 6 - Assign a cost category
    • 6.1 - Create a cost category
    • 6.2 - Edit cost category tab
    • 6.3 - Try to delete a assigned cost category
  • 7 - Try create a Machine without Code
    • 7.1 - Change configuration
    • 7.2 - Create a Machine without Code (it should be a failure)
  • 8 - Assign the Machine in a project
    • 8.1 - Create a project
    • 8.2 - Create a task
    • 8.3 - Assign the Machine in limiting resource form
    • 8.4 - Try to delete the assigned Machine
    • 8.5 - Delete the Project
  • 9 - Delete Machine
  • 10 - Delete all required elements

Tests for Virtual Workers Groups:

  • 1 - Create a new Virtual Worker
  • 2 - Create a Virtual Worker with duplicate type (it should be a failure)
  • 3 - Create a Virtual Worker with empty type (it should be a failure)
  • 4 - Create a Virtual Worker with duplicate name (it should be a failure)
  • 5 - Edit a Virtual Worker
  • 6 - Check other tabs
    • 6.1 - Check assigned criteria tab
      • 6.1.1 - Create a criterion
      • 6.1.2 - Assign this criterion to the Virtual worker
      • 6.1.3 - Try to delete the criterion
    • 6.2 - Check assigned calendar tab
      • 6.2.1 - Create a calendar
      • 6.2.2 - Assign this calendar to the Virtual worker
      • 6.2.3 - Try to delete the calendar
    • 6.3 - Check assigned cost category tab
      • 6.3.1 - Create a work hour
      • 6.3.2 - Create a cost category
      • 6.3.3 - Assign this cost category to the Virtual worker
      • 6.3.4 - Try to delete the cost category
  • 7 - Try create a Virtual worker without Code
    • 7.1 - Change configuration
    • 7.2 - create a Virtual worker without Code (it should be a failure)
  • 8 - Assign the virtual worker in a project
    • 8.1 - Create a project
    • 8.2 - Create a task
    • 8.3 - Assign the virtual worker in limiting resource form
    • 8.4 - Try to delete the assigned Virtual worker
    • 8.5 - Delete the Project
  • 9 - Delete Virtual Worker
  • 10 - Delete all required elements

Tests for Work Reports:

  • 1 - Create a work report without any work report model (it should be a failure)
  • 2 - Create a Work report from a lineal work report model
    • 2.1 - Create a lineal work report model
    • 2.2 - Create a work report
  • 3 - Create a Work report from a heading work report model
    • 3.1 - Create a heading work report model
    • 3.2 - Try to create a work report from heading model without task (it should be a failure)
  • 4 - Edit the work report including a line
    • 4.1 - Create a machine
    • 4.2 - Create a Work hour
    • 4.3 - Create a project
    • 4.4 - Complete the form and check the fields
  • 5 - Delete all the work reports
  • 6 - Delete all required elements

Tests for Companies:

  • 1 - Create a new Company
  • 2 - Create a Company with duplicate type (it should be a failure)
  • 3 - Create a Company with empty type (it should be a failure)
  • 4 - Create a Company with duplicate name (it should be a failure)
  • 5 - Edit a Company
  • 6 - Delete Company

Tests for Subcontracting:

  • 1 - Create a Company
  • 2 - Create a project
  • 3 - Create a task
  • 4 - Create a subcontract and assign the company like subcontractor
  • 5 - Send the task
  • 6 - Assign a progress to a subcontracted task
  • 7 - Send the progress
  • 8 - Check that the progress was send
  • 9 - Delete all required elements

Some tests to check the correct performance of the search labels from resources:

  • 1 - Create a criteria
  • 2 - Create workers
    • 2.1 - Create three workers
    • 2.2 - Assign different criterion to each one
    • 2.3 - Filter the elements
    • 2.4 - Check if the elements are correctly filtered
  • 2 - Create Virtual workers
    • 2.1 - Create three virtual workers
    • 2.2 - Assign different criterion to each one
    • 2.3 - Filter the elements
    • 2.4 - Check if the elements are correctly filtered
  • 3 - Delete all the workers
  • 4 - Delete all the virtual workers
  • 5 - Edit the criterion to be able to use it for machines
  • 6 - Create Machines
    • 6.1 - Create three machines
    • 6.2 - Assign different criterion to each one
    • 6.3 - Filter the elements
    • 6.4 - Check if the elements are correctly filtered
  • 7 - Delete all the machines
  • 8 - Delete criterion
 

Delay Causes

Final or Pending Considerations

 

Commits

%RPSHOWGITCOMMITS%

Tasks in this story

Tasks Est Spent To do Risk Reviewer Developer Task Name Start Date Est End Date End Date
Task 50 56 0 Low JavierMoran PabloFernandez Resources Tests      

Total Hours in this Story

User Spent in XpTracker Spent in phpReport Ok?
PabloFernandez 56 0 ALERT!
Total 56 0 ALERT!